Vibration Assessment of Subway Line 2
Project Overview
- A new building is planned near the operation section of Subway Line 2.
- Review of vibration and structure-borne noise within the office facility caused by subway operation.
- Comparison with recommended vibration/noise criteria and application of anti-vibration measures if exceeding limits.
- Application of anti-vibration measures using HD-MAT-50T (Slurry Wall method applied).
- Vibration/noise levels satisfied recommended criteria after implementation of anti-vibration measures.
Current Condition Prediction
-
Vibration Prediction

-
Structure-Borne Noise Prediction

Vibration Isolation Measures
Installation of vibration isolation mats in the minimum required area after considering cost-efficiency

Prediction After Vibration Isolation Measures
-
Vibration Prediction

-
Structure-Borne Noise Prediction

Vibration Isolation Installation
Installation of Vibration Isolation Mats in Slurry Wall Sections
-
STEP 01
Attaching the vibration isolation frame to the rebar cage

-
STEP 02
Hoisting the rebar cage with vibration isolation mats

-
STEP 03
Hoisting for diaphragm wall insertion

-
STEP 04
Insertion Process 1

-
STEP 05
Insertion Process 2

-
STEP 06
Insertion Completed: Concrete placement to follow