Vibration Assessment of Subway Line 4
Project Overview
- A new building is planned near the operation section of Subway Line 4.
- Assessment of vibration and structure-borne noise within office facilities caused by subway operation.
- Comparison with recommended vibration/noise criteria and application of vibration isolation measures if levels exceed limits.
- Application of vibration isolation using Po-MAT-50T (C.I.P method applied).
- Vibration/noise levels satisfied recommended criteria after implementation of isolation measures.
-
Floor Plan

-
SECTION A-A’

Current Condition Prediction
-
Vibration Prediction

-
Structure-Borne Noise Prediction

Vibration Isolation Measures
Installation of Vibration Isolation Mats in the Minimum Required Area Based on Cost-Efficiency
Prediction After Vibration Isolation Measures
-
Vibration Prediction

-
Structure-Borne Noise Prediction

Installation of Vibration Isolation Measures
Installation of Vibration Isolation Mats in C.I.P Method Sections