KOREAN
JAPAN
About NSV
Company information
History
Technical certification
Facilities
Agency
Location
Products
Noise control system
Shock control system
Vibration control system
Seismic control system
Installation video
Catalogue
R&D Center
Introduction
Facilities
Research field
Engineering service
Product selection guide
Business
Construction and supply
Installation and construction
Citation and rewards
PR
Exibition
NSV events
PR video
Press report
Recruitment
Right people for NSV
NSV PEOPLE
Task
Support
Notice
Inquiry
Company
Information
History
Technical
certification
Facilities
Agency
Location
Products
Noise control
Shock control
Vibration control
Seismic control
Installation
video
Catalogue
R&D Center
Introduction
Facilities
Research fields
Engineering service
Product
selection
guide
Business
Construction
and supply
Installation
and Construction
Citation and rewards
PR
Exhibition
NSV events
PR video
Press report
Voluntary Service
30th anniversary video
Recruitment
Right people for NSV
NSV PEOPLE
Task
HR System Welfare
Support
Notice
Inquiry
KOR
/
ENG
/
JAP
Business Performance
NSV creates the best business value
with its innovative technology
Business
Installation and construction examples
Access Floor
Vibration Attenuation System
NSV Vibration Attenuation System
Structure Vibration Attenuation System
NSV Structure Vibration Attenuation System
Noise Reduction System
NSV Noise Reduction System
Anti-noise facilities
NSV Anti-noise facilities
Access Floor
NSV Access Floor
Construction and Supply Performance
NSV Construction and Supply Performance
Installation and construction examples
NSV Installation and construction examples
Citation and rewards
NSV Citation and rewards
Access Floor
Vibration Attenuation System
MAT SYSTEM
JACK-UP SYSTEM
SPRING JACK-UP
NFM PLYWOOD
NEOPRENE PAD
■
PO-MAT SYSTEM
Construction of the whole air conditioning room
Construction of the whole air conditioning room (according to load of installation section)
Construction of the whole floor(elasticity + damping complex)
Partial pad of air conditioning room (surrounding masonry - construction)
Partial pad of air conditioning room (surrounding plain construction - construction)
Partial pad of air conditioning room (frame installation - construction)
■
NP-MAT SYSTEM
Construction of the entire air conditioning room
Partial pad of air conditioning room (plain construction)
Partial pad of air conditioning room (surrounding masonry)
■
HD-MAT SYSTEM
Construction of the entire bottom part of medical equipment room
Construction of the entire bottom part of the hazard tank
Construction of the entire bottom part of cultural asset room
■
COMBINATION SYSTEM
Complex mat installation for major facilities
Complex mat installation for major facilities
Complex mat installation for major facilities
■
JACK-UP / High-efficiency JACK-UP SYSTEM
Construction of the entire air conditioning room (JUM)
Construction of the entire air conditioning room (JUM-H)
Partial pad of air conditioning room
(surrounding plain construction - construction)
Partial pad of air conditioning room
(frame installation - construction)
JACK-UP Reinforcement Placing
JACK-UP LIFTING
■
SPRING JACK-UP SYSTEM
SPRING JACK-UP Arrangement
SPRING JACK-UP Reinforcement Placing
SPRING JACK-UP SPIRNG Embedment
■
NFM PLYWOOD SYSTEM
NFM PLYWOOD
(Cut on site, packing)
NFM PLYWOOD PANEL
(Arrangement installation)
NFM PLYWOOD PANEL
(Steel frame arrangement - construction)
■
NEOPRENE PAD
NSWP pad installation in generator room
NSWP pad installation for high-load medical equipment
NEOPRENE MOUNT + HD-MAT